IST

Also known as: Integrated Systems Testing, Level 5 commissioning

IST stands for Integrated Systems Testing, the last stage of commissioning, often called level 5. All systems run together under simulated load while the team triggers real scenarios: grid loss, generator start, the failure of a UPS or a chiller. It checks that the whole site behaves as designed, not only each piece of equipment.